Weekly Review – Keerthana Kumar – 25-03-2022

Home Forums Weekly reviews by Varalians Weekly Review – Keerthana Kumar – 25-03-2022

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #7186
    Srujith Sasi
    Keymaster

    This Week:
    1. Worked on the steps for the structure workshop(VAW8).
    2. Hosted the landing page for MTO i.e. habot.io in google cloud.
    3. Integrated the domain names in google cloud with Name Cheap.
    4. Merging the documents in the customer vault.
    5. Created a dummy UI for the structure workshop(VAW8).
    6. Upskilling on Ansible for automating configuration in devops.

    Next Week:
    1. Continuing working for the structure workshop to create tracks and UI.
    2. Continuing merging the documents in the customer vault.
    3. Continuing upskilling on Ansible.

Viewing 1 post (of 1 total)
  • You must be logged in to reply to this topic.